PROJECT:
Construction of additional 3 lane with paved shoulder (design length 8.87 km) as realignment of Bakaner Ghat (between Indore to Khalghat Section from existing Km 59+190 to Km 66+120) of NH 52 (Old NH 3) on EPC mode in the State of Madhya Pradesh
Scope of Work:
Detailed slope stability analysis of Bakaner Ghat section from chainage 59+190 to 66+120.
Our Contribution:
CDC provided the optimized and safe Design for Slope stability analysis which involve kinemetic analysis , Finite Element analysis and Calculation of Slope Mass Rating.